Software setup Flashing Functional test Fault analysis atben setup atusb setup Test procedure
To test an atben board, place a reference atusb board into the PC, insert the

The test process is started with
make ben
for an atben DUT and with
make usb
for an atusb DUT. It performs the following steps:
  • Enumeration (atusb only)
  • LED (atusb only; not yet implemented)
  • GPIO scan (not yet implemented)
  • Identification
  • Crystal frequency (only implemented on atben)
  • Spectrum
  • Receive
  • Send
Of these tests, only "LED" and "Spectrum" require operator input. The other tests run without interaction.

The test scripts log the commands they execute and their output in the file _log. The enumeration test verifies that the atusb board has been identified by the PC's USB stack. If this test fails, the board may not be plugged in correctly or it may be missing the firmware. A board that has passed both stages of the firmware flashing process should always pass the enumeration test. @@@ @@@ This test reads the transceiver's registers that contain values identifying the manufacturer, the chip's part number, and the chip revision. If an atusb board fails this test, this probably means that the MISO signal between transceiver and the microcontroller has a problem.

On atben, failure may simply indicate an improperly inserted board. Eject the board, re-insert, and try again. If the test keeps on failing, this may indicate a problem with MOSI, MISO, nSEL, SCLK, the power supply, the crystal oscillator, or possibly the position of the transceiver chip.

Note: this test is meant as a higher level test. The GPIO test should eventually provide more detailed results for problems with the SPI interface. This test measures the frequency of the crystal oscillator in the DUT. On atben, it does this by transmitting packets, and measuring the time between the SLP_TR pulse that starts the transmission and the interrupt signaling the end of the transmission.

If this test fails, this may indicate that the load capacitors of the crystal are missing, badly soldered, or have the wrong value. It could also mean that the crystal itself is defective. Another possible cause of oscillator malfunction could be flux residues bridging traces.

The fault analysis page has more details on testing the crystal oscillator. The spectrum test measures the reception of a signal sent from the reference device to the DUT. It does this across the entire frequency range in which the WPAN boards operate, allowing the detection of frequency-dependent anomalies.

This test depends on numerous external factors, like the exact position and orientation of the two devices with respect to each other, and the presence of any items that can reflect or absorb RF signals. Such items include metal chairs and human bodies. Because of the test's sensitivity to environmental factors, the operator needs to decide when the result represents a valid measurement and then confirm the result shown.

The image below shows the typical display during the spectrum test: the white line is the measured signal strength. The red lines indicate the minimum and maximum allowed values. The green circle in the upper right corner indicates that the signal strength is within the limits. A downward-pointing red triangle would indicate that the signal is too weak, an upward-pointing yellow triangle would indicate that the signal is too strong.

To finish the test, the operator must type either P, F, or Q in the window shown. P means "pass" and can only be entered if the measurement is within the limits. F means "fail" and can only be entered if the measurements is outside the limits. Q, quit, can be entered at any time and also fails the test. In the receive test, the reference device sends a number of frames to the DUT. The test program verifies correct reception of all the frames. A device that has passed all the preceding tests should not encounter problems in the receive test. If it does, there may be a problem with the bypassing of the transceiver's 1.8 V supplies. The send test is like the receive test, but with the DUT acting as the sender and the reference acting as the receiver. If a device passes the receive test but fails the send test, there is probably an issue with the bypass capacitors of the analog 1.8 V supply.

Another possible cause could a problem with the SLP_TR signal. The GPIO test should eventually catch this issue, but it may currently remain undetected until the send test.